Bathroom renovation. For many, this phrase conjures images of mess, dust, construction debris, and additional costs. However, once you begin, everything quickly becomes quite simple and clear.
First, you need to plan the overall layout of the bathroom. Where will the bath or shower cubicle, washbasin, and toilet be located? Will they be combined or separate? Which wall will hold the mirror, and which the towel rail? The placement of the hot and cold water pipes, which will eventually connect to the plumbing fixtures, depends on these decisions.
Bathroom Renovation Made Easy – What You Need to Know
All pipes must be concealed within the walls. This requires carving grooves into the walls to accommodate the polypropylene pipes. Carefully calculate the wall thickness beforehand and install the pipe fittings where the mixer will later be positioned, ensuring the thread is flush with the ceramic wall tile (not protruding). Don't forget the hermetic sealing of the connections, which must be checked by pressurising the pipes after installation.
Now, fill the grooves and plaster the walls to ensure they are straight. Straightening the walls will result in a square or rectangular room, which will be helpful for subsequent wall tiling.
Next, you can consider underfloor heating systems, of which there are many types. You can install electric or water-based heating. The choice depends on the technical specifications of the room. If the riser and drainage pipes are located on the wall, they need to be made accessible by constructing a box from moisture-resistant plasterboard, ensuring an inspection opening.
Once you've chosen your ceramic tiles, you can immediately start 'dressing' the bathroom. First, tile the floor – this can be done diagonally or in a simple grid pattern. Then, tile the walls according to your chosen design. When tiling walls, start from the furthest corner and work towards the door. The previously constructed box should also be tiled. Now that the bathroom walls are complete, it's time to select the ceiling; a stretch ceiling would be ideal here. It's easy to install and often more cost-effective than plastic panels.
After the adhesive has set and strengthened, you can begin installing the plumbing fixtures. The bath is installed using silicone sealant, which is applied to all edges.
The toilet is carefully placed in its pre-prepared position, taking care not to damage the underfloor heating system. Once all fixtures are installed, your bathroom is ready for use.
